menu
 
 

REN

Learn more about AGIR Prize here.

Sustainability

REN's mission is to ensure the uninterrupted supply of energy to the entire country, thus contributing to the development of communities and improved quality of life for the residents of Portugal. This is a task requiring ongoing effort and dedication. However, nowadays, our commitment goes beyond our mission. We believe in active corporate citizenship with significant involvement with the communities in which we work, from both a social as well as an environmental perspective.

Find out more here

5 6 1 2 MW
20 September 2019, 16:35:00
2.52 0.01 0.4
Cotação VAR VAR%
  • ALQUEVA

    SUBSTATION

    • Potência Instalada

      340MVA

    • 2

      Transformadores /
      Autotransformadores

  • ALTO DO SÃO JOÃO

    SUBSTATION

    • Potência Instalada

      340MVA

    • 2

      Transformadores /
      Autotransformadores

  • ALTO MIRA

    SUBSTATION

    • Potência Instalada

      1580MVA

    • 6

      Transformadores /
      Autotransformadores

  • ARMAMAR

    SUBSTATION

    • Potência Instalada

      450MVA

    • 1

      Transformadores /
      Autotransformadores

  • BATALHA

    SUBSTATION

    • Potência Instalada

      510MVA

    • 3

      Transformadores /
      Autotransformadores

  • BODIOSA

    SUBSTATION

    • Potência Instalada

      340MVA

    • 2

      Transformadores /
      Autotransformadores

  • CANELAS

    SUBSTATION

    • Potência Instalada

      486MVA

    • 4

      Transformadores /
      Autotransformadores

  • CARRAPATELO

    SUBSTATION

    • Potência Instalada

      340MVA

    • 2

      Transformadores /
      Autotransformadores

  • CARREGADO

    SUBSTATION

    • Potência Instalada

      360MVA

    • 3

      Transformadores /
      Autotransformadores

  • CARRICHE

    SUBSTATION

    • Potência Instalada

      580MVA

    • 4

      Transformadores /
      Autotransformadores

  • CARVOEIRA

    SUBSTATION

    • Potência Instalada

      340MVA

    • 2

      Transformadores /
      Autotransformadores

  • CASTELO BRANCO

    SUBSTATION

    • Potência Instalada

      689MVA

    • 4

      Transformadores /
      Autotransformadores

  • CHAFARIZ

    SUBSTATION

    • Potência Instalada

      315MVA

    • 3

      Transformadores /
      Autotransformadores

  • CUSTÓIAS

    SUBSTATION

    • Potência Instalada

      466MVA

    • 3

      Transformadores /
      Autotransformadores

  • ERMESINDE

    SUBSTATION

    • Potência Instalada

      510MVA

    • 3

      Transformadores /
      Autotransformadores

  • ESTARREJA

    SUBSTATION

    • Potência Instalada

      548MVA

    • 4

      Transformadores /
      Autotransformadores

  • ESTÓI

    SUBSTATION

    • Potência Instalada

      378MVA

    • 3

      Transformadores /
      Autotransformadores

  • ESTREMOZ

    SUBSTATION

    • Potência Instalada

      126MVA

    • 2

      Transformadores /
      Autotransformadores

  • ÉVORA

    SUBSTATION

    • Potência Instalada

      189MVA

    • 3

      Transformadores /
      Autotransformadores

  • FAFE

    SUBSTATION

    • Potência Instalada

      340MVA

    • 2

      Transformadores /
      Autotransformadores

  • FALAGUEIRA

    SUBSTATION

    • Potência Instalada

      1026MVA

    • 4

      Transformadores /
      Autotransformadores

  • FANHÕES

    SUBSTATION

    • Potência Instalada

      1860MVA

    • 6

      Transformadores /
      Autotransformadores

  • FEIRA

    SUBSTATION

    • Potência Instalada

      340MVA

    • 2

      Transformadores /
      Autotransformadores

  • FERNÃO FERRO

    SUBSTATION

    • Potência Instalada

      954MVA

    • 5

      Transformadores /
      Autotransformadores

  • FERREIRA DO ALENTEJO

    SUBSTATION

    • Potência Instalada

      739MVA

    • 5

      Transformadores /
      Autotransformadores

  • FERRO

    SUBSTATION

    • Potência Instalada

      315MVA

    • 3

      Transformadores /
      Autotransformadores

  • FRADES

    SUBSTATION

    • Potência Instalada

      340MVA

    • 2

      Transformadores /
      Autotransformadores

  • GUIMARÃES

    SUBSTATION

    • Potência Instalada

      126MVA

    • 1

      Transformadores /
      Autotransformadores

  • LAGOAÇA

    SUBSTATION

    • Potência Instalada

      1350MVA

    • 3

      Transformadores /
      Autotransformadores

  • LAVOS

    SUBSTATION

    • Potência Instalada

      340MVA

    • 2

      Transformadores /
      Autotransformadores

  • MACEDO DE CAVALEIROS

    SUBSTATION

    • Potência Instalada

      252MVA

    • 2

      Transformadores /
      Autotransformadores

  • MOGADOURO

    SUBSTATION

    • Potência Instalada

      126MVA

    • 2

      Transformadores /
      Autotransformadores

  • MOURISCA

    SUBSTATION

    • Potência Instalada

      416MVA

    • 3

      Transformadores /
      Autotransformadores

  • OLEIROS

    SUBSTATION

    • Potência Instalada

      422MVA

    • 3

      Transformadores /
      Autotransformadores

  • PALMELA

    SUBSTATION

    • Potência Instalada

      900MVA

    • 2

      Transformadores /
      Autotransformadores

  • PARAIMO

    SUBSTATION

    • Potência Instalada

      790MVA

    • 3

      Transformadores /
      Autotransformadores

  • PEDRALVA

    SUBSTATION

    • Potência Instalada

      1040MVA

    • 3

      Transformadores /
      Autotransformadores

  • PENELA

    SUBSTATION

    • Potência Instalada

      340MVA

    • 2

      Transformadores /
      Autotransformadores

  • PEREIROS

    SUBSTATION

    • Potência Instalada

      422MVA

    • 3

      Transformadores /
      Autotransformadores

  • POCINHO

    SUBSTATION

    • Potência Instalada

      183MVA

    • 2

      Transformadores /
      Autotransformadores

  • POMBAL

    SUBSTATION

    • Potência Instalada

      126MVA

    • 1

      Transformadores /
      Autotransformadores

  • PORTIMÃO

    SUBSTATION

    • Potência Instalada

      790MVA

    • 3

      Transformadores /
      Autotransformadores

  • PORTO ALTO

    SUBSTATION

    • Potência Instalada

      126MVA

    • 2

      Transformadores /
      Autotransformadores

  • PRELADA

    SUBSTATION

    • Potência Instalada

      340MVA

    • 2

      Transformadores /
      Autotransformadores

  • RECAREI

    SUBSTATION

    • Potência Instalada

      1196MVA

    • 4

      Transformadores /
      Autotransformadores

  • RIBA D'AVE

    SUBSTATION

    • Potência Instalada

      1306MVA

    • 6

      Transformadores /
      Autotransformadores

  • RIO MAIOR

    SUBSTATION

    • Potência Instalada

      1152MVA

    • 4

      Transformadores /
      Autotransformadores

  • SACAVÉM

    SUBSTATION

    • Potência Instalada

      510MVA

    • 3

      Transformadores /
      Autotransformadores

  • SANTARÉM

    SUBSTATION

    • Potência Instalada

      252MVA

    • 2

      Transformadores /
      Autotransformadores

  • SETE RIOS

    SUBSTATION

    • Potência Instalada

      510MVA

    • 3

      Transformadores /
      Autotransformadores

  • SETÚBAL

    SUBSTATION

    • Potência Instalada

      498MVA

    • 4

      Transformadores /
      Autotransformadores

  • SIDERURGIA DA MAIA

    SUBSTATION

    • Potência Instalada

      320MVA

    • 3

      Transformadores /
      Autotransformadores

  • SINES

    SUBSTATION

    • Potência Instalada

      960MVA

    • 4

      Transformadores /
      Autotransformadores

  • TÁBUA

    SUBSTATION

    • Potência Instalada

      126MVA

    • 1

      Transformadores /
      Autotransformadores

  • TAVIRA

    SUBSTATION

    • Potência Instalada

      702MVA

    • 3

      Transformadores /
      Autotransformadores

  • TORRÃO

    SUBSTATION

    • Potência Instalada

      296MVA

    • 2

      Transformadores /
      Autotransformadores

  • TRAFARIA

    SUBSTATION

    • Potência Instalada

      340MVA

    • 2

      Transformadores /
      Autotransformadores

  • TRAJOUCE

    SUBSTATION

    • Potência Instalada

      510MVA

    • 3

      Transformadores /
      Autotransformadores

  • TUNES

    SUBSTATION

    • Potência Instalada

      441MVA

    • 4

      Transformadores /
      Autotransformadores

  • VALDIGEM

    SUBSTATION

    • Potência Instalada

      502MVA

    • 4

      Transformadores /
      Autotransformadores

  • VALPAÇOS

    SUBSTATION

    • Potência Instalada

      252MVA

    • 2

      Transformadores /
      Autotransformadores

  • VERMOIM

    SUBSTATION

    • Potência Instalada

      1580MVA

    • 6

      Transformadores /
      Autotransformadores

  • VILA CHÃ

    SUBSTATION

    • Potência Instalada

      378MVA

    • 4

      Transformadores /
      Autotransformadores

  • VILA FRIA

    SUBSTATION

    • Potência Instalada

      422MVA

    • 3

      Transformadores /
      Autotransformadores

  • VILA POUCA DE AGUIAR

    SUBSTATION

    • Potência Instalada

      410MVA

    • 3

      Transformadores /
      Autotransformadores

  • ZAMBUJAL

    SUBSTATION

    • Potência Instalada

      340MVA

    • 2

      Transformadores /
      Autotransformadores

  • ZÊZERE

    SUBSTATION

    • Potência Instalada

      630MVA

    • 4

      Transformadores /
      Autotransformadores

  • 5,612

    LAMPS (40W) WE CAN TURN ON WITH THE ELECTRICITY CONSUMED NOW

Gas Consumption

Actual Gas Consumption

7 1 2 1 MW
  • CAMPO MAIOR

    INTERCONNECTION POINT

    • Technical cap. entry limit

      134GWh/day

    • Technical cap. output limit

      70GWh/day

  • VALENÇA DO MINHO

    INTERCONNECTION POINT

    • Technical cap. input limit

      40GWh/day

    • Technical cap. output limit

      25GWh/day

  • 7,121

    STOVES (1000W) WE CAN TURN ON WITH THE GAS BEING CONSUMED NOW

Biodiversity

1 million native trees planted between 2010 and 2018. More than 2,000 hectares that contribute to the development of local economies and forest fire protection.

 

1,000,000

Native trees planted between 2010 and 2018

Saber Mais 
0 0 0 0 MW