Ferreira do Alentejo – Pegões – Rio Maior axis, at 400kV

Status Awaiting Environmental Impact Statement

Start Jan 2022

End Dec 2026

REN

Ferreira do Alentejo – Pegões – Rio Maior axis

Project Goals

  • The ongoing energy transition depends on an increasingly higher contribution from renewable energies to the production of electricity, accompanied by a decrease in the use of fossil fuels. To enable this entire process, one of the necessary components is the proper connection of new renewable power plants to the grids, ensuring that they meet the necessary conditions for the flow of generated energy. 
  • Given the power already allocated for new photovoltaic power plants, namely in the south of Portugal, the current PSEG (Public Service Electricity Grid) lacks capacity to accommodate new generation in this region. 


Phases of the project

  • Environmental study: 2022
  • Public consultation: 14 February 2024 to 26 March 2024
  • Environmental Impact Statement: Under review
  • Establishment licence: ----
  • Contact with landowners: ----
  • Construction: ----
  • Completion of the project: Scheduled for 2026

Planned infrastructures

  • Construction of the Portuguese National Transmission Network axis between Ferreira do Alentejo – Pegões – Rio Maior, at 400kV

Location

  • Ferreira do Alentejo

Union of the Parishes of Ferreira do Alentejo e Canhestros
Odivelas
Figueira dos Cavaleiros

  • Vendas Novas

Vendas Novas
Landeira

  • Caldas da Rainha

Vidais

  • Azambuja

Azambuja
Aveiras de Baixo
Alcoentre
Union of the Parishes of Manique do Intendente, Vila Nova de São Pedro e Maçussa
Aveiras de Cima
Vale do Paraíso

  • Rio Maior

Rio Maior
Arrouquelas
Asseiceira

  • Benavente

Benavente
Santo Estêvão

  • Coruche

Branca
Biscainho
Union of the Parishes of Coruche, Fajarda e Erra

  • Salvaterra de Magos

Union of the Parishes of Salvaterra de Magos e Foros de Salvaterra
Marinhais

  • Cartaxo

Union of the Parishes of Ereira e Lapa

  • Montijo

Canha
União das Freguesias de Pegões

  • Alcácer do Sal

São Martinho
Union of the Parishes of Alcácer do Sal (Santa Maria do Castelo e Santiago) e Santa Susana
São Martinho

  • Grândola

Azinheira dos Barros e São Mamede do Sádão


Technical Data Sheet

  • Voltage level: 400 kV
  • Approximate length: 190 kilometres
  • Number of supports: 618 new supports and use of the 23 existing supports