Paraimo – Feira – Arouca – Recarei axis, at 400 kV

Status In progress

Start Jan 2022

End Dec 2026

Related links
REN

Paraimo – Feira – Arouca – Recarei axis, at 400 kV

Project Goals

  • Enable the distribution of renewable energy, with an emphasis on photovoltaic energy;
  • Compliance with the 2030 National Energy and Climate Plan.

Phases of the project

  • Environmental study: 2022
  • Public consultation: 22 December 2023 a 5 February 2024
  • Environmental Impact Statement: 27 September 2024
  • Establishment licence: April 2025
  • Contact with landowners: 4th quarter of 2025 to 4th quarter of 2026
  • Construction: October 2026
  • Completion of the project: Scheduled for 2026

Planned infrastructures

  • Construction of the Arouca switching station (PCARC)
  • Construction of the Paraimo – Feira – Arouca – Recarei axis, at 400 kV

Location

  • Águeda

União das Freguesias do Préstimo e Macieira de Alcoba
União das Freguesias de Belazaima do Chão, Castanheira do Vouga e Agadão

  • Anadia

Avelãs de Cima
Moita
União das Freguesias de Arcos e Mogofores
Sangalhos
São Lourenço do Bairro
União das Freguesias de Amoreira da Gândara, Paredes do Bairro e Ancas

  • Arouca

Fermedo
São Miguel do Mato
Escariz
Mansores
Chave

  • Castelo de Paiva

União das Freguesias de Raiva, Pedorido e Paraíso
Santa Maria de Sardoura
Real

  • Mortágua

Espinho

  • Oliveira de Azeméis

Ossela

  • Paredes

Recarei
Aguiar de Sousa
Sobreira
Gandra

  • Penafiel

Rio Mau
Lagares e Figueira
Capela
Canelas
Sebolido

  • Sever do Vouga

Pessegueiro do Vouga
Sever do Vouga
União das Freguesias de Cedrim e Paradela
Talhadas
União das Freguesias de Silva Escura e Dornelas
Rocas do Vouga

  • Vale de Cambra

Macieira de Cambra
Roge
Cepelos
Junqueira
São Pedro de Castelões
União das Freguesias de Vila Chã, Codal e Vila Cova de Perreirinho


Technical Data Sheet

  • Voltage level: 400 kV
  • Approximate length: 130 kilometres