Portugal-Spain Interconnection
The Project enables increasing the interconnection capacity between Portugal and Spain, in line with the objectives established in the Iberian Electricity Market (“MIBEL”) framework and those of cross-border capacity defined at the European level.
Higher and more variable energy flows are expected between the two countries due to the increase in installed generation power based on variable sources and market exchanges.
The Project is part of the new 400 kV interconnection axis between Minho and Galicia, connecting the Beariz and Fontefría substations, in Spain, and the Porto area, passing through the Ponte de Lima and Vila Nova de Famalicão1 substations, in Portugal.
The new interconnection between Portugal and Spain includes a double overhead line axis at 400 kV between Beariz (Spain) – Fontefría (Spain) – Ponte de Lima (Portugal), including the new 400 kV substations of Beariz and Fontefría, in Spain, and Ponte de Lima, in Portugal.
The cross-border section, Fontefría – Ponte de Lima, in a double overhead line, will have only one circuit installed in the initial phase. Total estimated length: 90 km, with 18 km in Spain2 and 72 km in Portugal3.
1The section between Vila Nova de Famalicão and the Ponte de Lima area is already in service.
2Spanish section between the Fontefría substation and the Spain-Portugal border.
3Portuguese section between the Ponte de Lima substation and the Spain-Portugal border.
The Project will enable increasing the interconnection capacity between Spain and Portugal, enabling a more efficient operation of the MIBEL, with an impact on the development of the single European electricity market.
The broad operation of the MIBEL depends on the existence of an interconnection capacity that allows exchanges of electrical energy with a reduced number of events of network congestion, both in the Portugal→Spain direction and in the Spain→Portugal direction.
The Project’s execution enables sustainably reaching a minimum value of 3 000 MW of commercial interconnection capacity in both directions, objective at the Iberian Summit between the Governments of Portugal and Spain, also meeting the cross-border capacity objectives defined at European level.
According to the studies conducted under TYNDP 2022, as a consequence of the resulting increase in interconnection capacity between Portugal and Spain, the Project provides, in the 2030 horizon, a reduction in variable generation costs from €4M/year to €29M/year, depending on the scenarios, also taking into account the increase in interconnection capacity between the grids of France and Spain foreseen for that time horizon.
Additionally, the Project will also enable, in the 2030 horizon, avoiding a loss of generation from renewable energy sources in the order of 38 to 464 GWh/year, depending on the scenarios.
This Project is especially relevant for the implementation of the European Union’s energy policy targets, namely:
The Project was subject to public consultation conducted by the Portuguese Energy Services Regulatory Entity as part of the procedure for drawing up the Transmission Network Development and Investment Plan.
In the environmental impact assessment (“EIA”) procedure, the Project was already subject to public consultation in a phase prior to the preparation of the environmental conformity report of the execution project, and it is expected that it will again be submitted to public consultation, this time with the execution project, by the EIA authority, as well as within the licencing procedure through the publication of an edict promoted by the licencing entity.
Voltage level: 400 kV
Line extension: 90 km
Number of line poles: 168