Viana do Castelo – Vila Fria power line, 150 kV

Status Awaiting Environmental Impact Statement

Start Jan 2024

End Dec 2027

REN

Viana do Castelo – Vila Fria power line, 150 kV

Goals

New power transmission line from the Viana do Castelo Cut Station to the Vila Fria Substation, part of the National Transmission Grid.

  • Connection to the National Transmission Grid for Windfloat Atlantic production;
  • Increased reception capacity for new offshore generation;
  • Increased security of supply for the transmission grid.

Phases of the project

  • Environmental study: Under development
  • Public consultation: ----
  • Environmental Impact Statement: ----
  • Establishment Licence: ----
  • Contact with landowners: ----
  • Construction: ----
  • Completion of the project: ----

Planned infrastructure

• 150 kV line, partly underground and partly overhead.



Localização

  • Estremoz

São Domingos de Ana Loura
União de Freguesias de São Lourenço de Mamporcão e São Bento de Ana Loura

  • Borba

Borba (Matriz)
Orada

  • Vila Viçosa

Cilada

  • Elvas

União de Freguesias de Terrugem e Vila Boim

  • Alandroal

União de Freguesias de Terrugem e Vila Boim
União de Freguesias do Alandroal (Nossa Senhora da Conceição, São Brás dos Matos (Mina do Bugalho), e Juromenha (Nossa Senhora do Loreto)


Technical Data Sheet

  • Voltage level: 150 kV